动态

(无标题)

Zephyr
So, TSMC needs to fab 1.3M H200s in 2026
At 55 dies per wafer, they need to dedicate nearly 24,000 wafer starts
Allocating 3,000 WPM N4 capacity over 8 months should be enough

It will generate nearly $450M for TSMC (@ $18k per wafer)
The real bottleneck will be CoWoS-S capacity
动态Andrew Curran2025-12-31原文

相关内容